
Aquatic Resource Assessment
REC ensures thorough and efficient aquatic surveys including:
- Electrofishing for fish population inventories and salvages
- Redd/spawning surveys
- Detailed habitat assessments
- Water quality assessments
- Qualified Aquatic Environmental Specialist (QAES) surveys
- Groundwater and surface water monitoring
- Turbidity monitoring and analysis
- Flow analysis and monitoring during water withdrawal
- De-watering assessments and monitoring
Relevant Projects

Maintenance Rebuild of the AltaLink 551L and 54L transmission lines between Canmore and Lake Louise
Banff National Park
AltaLink

Lake Louise Ski Area aquatic habitat assessment
Banff National Park
Lake Louise Ski Area

Ghost River Emergency Channel Reconstruction
Ghost River, Alberta
Bremner Engineering & Construction Ltd.

Pigeon Creek Flood Mitigation and Channel Re-Alignment Project
Dead Man’s Flats, Alberta
Bremner Engineering & Construction Ltd.

Goat Creek Dredging Project
Kananaskis, Alberta
Bremner Engineering & Construction Ltd.

South Canmore Main Waterline Replacement Project
Canmore, Alberta
Epcor

Pipe Salvage Project in the Bow River
Banff, Alberta
Town of Banff

Post-Flood Reclamation Project for the Cascade Hydro facility
Banff National Park
TransAlta

Renewal of the 42-year lease for the Banff Springs Golf Course and Rafting Operations
Banff National Park
Fairmont Banff Springs

Water Permit Renewal for the Banff Springs Golf Course
Banff National Park
Fairmont Banff Springs

Banff Trail Riders CABIN assessment
Banff National Park
Corvidae Environmental Consulting